Sl. No.

Project

Organisation

Year of Completion

Amount Of project in        (lacks)

1.

C/o sub structure of major bridge on the river Boila on BG formation in connection with LMG-SCL Gauge Conversion Project

N.F.Railway

2011

2593.92

2.

Construction of foundation,substructure & superstructure of Major Bridge No.III/113 between Jatinga Lampur-New Harangajao station in connection with Lumding-Silchar Gauge Conversion Project.(J.V.)

N.F.Railway

2012

2452.44

3

Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC No 45AB at Km. 324/13-14 between Chapra Kacheri-Goldengunj section in Varanasi Division of North Eastern Railway,

IRCON

2016

2246.51

4

Construction of foundation, substructure and superstructure of Major Bridge No. III/80 span 7X30.5M on pile foundation line in connection with Lumding – Silchar GC Work. (J.V)

N.F.Railway

2012

2036.13

5

C/o of foundation and substructure of Br.20 32, 33, and 36 in between Muzaffarpur-Sitamarhi section. (JV)

E.C.Railway

2009

1894.72

6

Construction of Major Bridge over Nandakumar-Digha High way (RUB) steel through girder and Major Bridge over Hijili Tidal Canal including Substructure, Transportation, Erection and Launching of Super structure and miscellaneous work, in connection with Deshpran- Nandigram new line .

S.E Railway

2016

1467.00

7

Construction of foundation, substructure for Major Bridge Nos. 484, 487, 490, 497, 498 & 525 in between Banderkhal – Damcherra in connection with Lumding – Silchar GC Work.

N.F.Railway

2009

949.80

8

Manufacturing of Pre-stressed concrete(PSC) bridge slabs and RCC ballast retainer in Rangiya - Rangapara in connection with Gauge Conversion of Rangiya - Rangapara North

N.F.Railway

2012

925.50

9

C/o Steel Truss Bridge over river Sriramkhari near BP No. 218 and 218/1-S of 180m span in the alignment of IBB Road along with protection works .

C.P.W.D

2016

651.00

10

C/o Steel Truss Bridge over river Punarbhava near BP No. 219 and 219/1-S of 180m span in the alignment of IBB Road along with protection works .

C.P.W.D

2016

643.00

11

Construction of PSC/RCC approach slab in the approach of major bridge including contruction of ballast retainer , inspection steps and other miscellaneous work in between RPAN-NLP section of BVU-BHNG section .

N.F. Railway

2016

565.00

12

Construction of Major Bridge No.49 & 66(ROB) involving 12.2m span PSC Girder between Bhimgarah - Panchra station,21.06m span Composite girder over ROB in connection with doubling between Pandabeswar and Sainthia in Andal-Sainthia Section of Asansol Division

Eastern Railway

2009

476.17

13

Constructions of Major Br.No 141,148 &154 on pile foundation and PSC Girders between New Maynaguri & Jogighopa .

N.F.Railway

2009

462.02