Current Projects
Bridges & Flyover
Tunnel & Supply Work
Highways & Roads
   
Completed Projects
Building Work
Earth Work
Bridge Work
Tunnel & Supply Work
Roads Work



Tunnel & Supply Work

SL. No.

Name Of The Work

EMPLOYER

Value Of The Contract( in lakhs)

1.

Construction of singal line BG tunnel No. 8A between Km 93/825 - 94/400 and other miscellaneous work at approaches of tunnel portals to make formation as BG standard including protection work in connection with station Mahur to New Haflong(J.V)

N.F.Railway

1987.68

2.

C/o Single line BG Tunnel No. 4A by cut & cover method between Km. 76/950 – 77/550 and earthwork in formation as per BG standard in connection with Lumding – Silchar GC Work. (J.V)

N.F.Railway

1678.07

3.

Supply and spreading of ballast and granular materials on or near the BG formation from Km 26.425 to Km 54.330 in between Purana Dibalong and Mupa yard in connection with Lumding Silchar Gauge Conversion Project.

N.F.Railway

1649.85

4.

Deport supply of 50 mm size hard durable stone ballast as p[er RDSO specification IRS Ge - I June 2004 from private guarry & Loading in to Rly Wagon & Unloading the same at work site & spreading uniformly on the truck in connection with through ballast

N.F.Railway

690.84

5.

Supplying & Spreading of Blanketing material at top of formation in between station Baraigram - Chandkhirabagan in connection with Gauge conversion work between BRGM-KUGT section of LMG-SCL project

N.F.Railway

233.30