BRIDGE WORK
Sl No | Name Of Work | Employer |
Value Of The Contract (in CR) |
1. | C/o IWT RO-RO Terminal at Dhubri (Assam) | CPWD, Guwahati | 44.98 |
2. | Construction of foundation & Substructure over pile foundation for Major Bridge no. 115 (6X103.50m + 1X47.24m steel Girder) at Ch. 34765m including all other ancillary works and protection works in between station Bairabi & Sairang in connection with the construction of New BG railway line from Bairabi to Sairang (Mizoram). | N.F.Railway | 104.80 |
3. | Construction of private railway siding with all contractor's materials for coal transportation system for Darlipalli STPP of NTPC limited in Sundergarh dist. In Odisha state - MGR works package-3-from Ch. 4/062 and up to Ch. 6/000 | IRCON | 20.77 |
4. | Construction of Bridge on approach road at chainage 3.3 Km and 7.2 Km on Pakri-Barwadih for coal Mining Project of NTPC at Barkagaon (Jharkhand) (Package-II) | CPWD | 17.45 |
5. | Construction of Road over Bridge both railway span and adjacent approaches span including reinforced earth wall/Retaining wall in lieu of LC No 45AB at Km. 324/1314 between Chapra Kacheri-Goldengung section in Varanasi Division of North Eastern Railway | IRCON | 22.64 |
6. | Construction of balance work of Road OverBridge both Railway span and adjacent span including Reinforced Earth wall/Retaining wall in lieu of LC-53A at Km 613/1921 between Kauriya Halt Bihiya section of Patna Mughalsarai route in Danapur division of E.C.Railway Bihar. | IRCON | 14.65 |
7. | Construction of Road Over Bridge in lieu of Level Crossing No. 160 at Km: 286/23-25 between Mahalimarup and Rajkharsawan Stations under the jurisdiction of Dy. Chief Engineer (Con), Tatanagar in Chakradharpur Division of S.E.Railway | S.E.Railway | 36.75 |
8. | Construction of Road Over Bridge in lieu of Level Crossing No. RBK-37 at Km:350/5-7 between Kendposi and Maluka Stations under the jurisdiction of Dy. Chief Engineer (Con), Tatanagar in Chakradharpur Division of S.E. Railway | S.E.Railway | 39.89 |
9. | Construction of proposed Bridge over river Punorbhaba at Balipukur ghat route in the district of dakshin dinajpur. | NBDD | 11.38 |
10. | Balance work for earthwork in cutting and filling with mechanical Compaction, supplying. spreading and compaction of stone dust blanketing, construction of Major Bridge No.33 (1 x 61.0Om open web girder, the girder will be supplied by Railway), Br.No.31 (RUB), reaming work of other minor bridges, construction of new platform wall, retaining wall, linking of track & points & crossing, supplying, stacking & spreading of machine crushed stone ballast on cess, transporting of P.Way materials and fabricated girder components, approach station road at Sondalia and Beliaghata road, construction of station building at Sondalia, FOB & PF Shed at Beliaghata road, misc. protection work and other ancillary works including remodelling of both the yards for doubling between stations Sondalia (including) (Km 12.120) and Lebutola (including) (Km 18.070) in connection with doubling between Sondalia & Champapukur. | EASTERN RAILWAY | 25.18 |