EARTHWORK / HILL PROTECTION / DESILTING PROJECTS

Sl No Name Of Work Organisation Year of Completion Amount Of project in (IN CR)
1. Construction of BG standard formation, minor bridge including retaining wall, side drains, catch water drains, formation treatment of bad banks and all other connected ancillary works in between Km 98.00 (Excluding Hojai station yard) to Km 145.00 in connection with Digaru Hojai double line project of N.F.Railway. N.F.Railway 2021 127.01
2. Earthwork in cutting to form formation & in filling to form embankment i/c mechanical compaction & c/o minor br. At different lacation & other ancillary works in between Thingou to Noney Ch. 63.623 Km to 81.500 Km in connection of new railway line from Jiribam to Tupul. N.F.Railway 2018 180.23
3. Filling and Development of site, Construction of Boundary wall, RCC overhead tank, Box Culvert, approch road and other miscellanceous works in connection with rake maintenance depot at Joka. RVNL 2022 116.21
4. Earthwork in formation for railway embankment and construction of minor bridges & major bridge no. 165 at Ch. 152/2-3 Km along with all other connected ancillary works from new Alipurduar-samuktala Road Jn. From Km 144.660 to Km 155.210 in connection with the doubling of BG railway line from New Coochbehar - Samuktala Road. N.F.Railway 2017 37.09
5. Construction of Minor bridges (RCC Box/Horse Shoe) Br. No 60 at Ch. 43500, Br. No 60/A at Ch. 44580, Br. No. 61/A at Ch. 46680, Br. No 62 at Ch. 46925 and /br. No. 63 at Ch. 47200 and other ancillary work works in between Tunnel no 10 & Tunnel no 11B, in connection with the construction of New BG railway line from Jiribam to Tupul (Imphal) N.F.Railway 2022 60.97
6. Anti Erosion of Paimar River (Desilting of Bed lncluding protection works) fiom Malisandh Barrage to Lodipur village and Lodipur to Sunder Bigha via-Beldariya Bigha under Dist.- Nalanda Floor Control & Drainage Division 2020 14.34
7. Anti Erosion of Paimar River (Desilting of Bed lncluding protection works)from Sunder Bigha via- Bichhakolvillage to Kodawa weir under Dist.- Nalanda Floor Control & Drainage Division 2020 12.70
8. Protection of Hill slopes by construction of retaining walls, Breast walls, Toe wall-cum-drains side & catch water drains by using Geotextile/Geogrid/Geojute with turfings from Km 93.00 to Km 103.00 Km between Jolaibari & Manubazar station in connection with Agartala-Sabroom new BG line project. N.F.Railway 2019 23.4
9. Earthwork in cutting to from formation and earthwork in filling to form embankment / sub-bank and constructions of minor bridges between chainage Km 41.90 and Km 47.84 between stations Kambiron Road and Thingou in connection with construction of new BG Railway line from Jiribam to Tupul N.F.Railway 2016 35.61
10. Construction of private railway siding with all contractors material for construction of coal Transportation system for Darlipali STPP of NTPC limited in Sundergarh Dist in Odisha state Ch 4062 to Ch 6000 package-3 in Darlipali-dulanga MGR Section IRCON 2020 79.47